BUNKERFUELPRICES

Paranagua bunker prices

BRPNG · BR · Major bunkering hub

Individual prices at Paranagua

GradeUSD / MTUpdated
MGO$16372026-10-097d
VLSFO$9402026-10-097d

Not an offer to sell — a firm price exists only once a supplier has quoted.

Indicative only. Typical stem time here is about 8 hours alongside.

Who supplies fuel at Paranagua

8 of these are on the port authority's register of licensed suppliers. The rest publish their own coverage of this port.

Enquiry contacts for all 9 suppliers

Their bunker desks, or send one request and let the replies come to you.

Taking fuel at Paranagua

Operational notes, from the port authority and the suppliers’ own published documents. Checked 2026-08-31.

At Paranagua the fuel is Petrobras's and the request goes to them through your agent. Transpetro's terminal booklet for TEPAR describes two routes. Alongside the pier the terminal supplies directly by pipeline, pumping through 4-inch hoses for MGO at 100 m3/h and 8-inch hoses for marine fuel at 600 m3/h. For ships lying offshore, supply is by barge; the barges themselves load at the terminal's 100-metre secondary pier, which takes barges to 19 feet draught and is loaded with MGO and VLSFO.

The two pier berths, PP-1 and PP-2, both take 11.60 metres draught and 190 metres LOA, at maximum deadweight 110,000 and 80,000 tonnes respectively; both require a pilot, and manoeuvres run 24 hours a day. NOR is tendered at the usual port anchorage, the docking schedule is regulated by APPA, and ships bound for the flammables pier must pass ETA through the agent at least 24 hours ahead to be scheduled.

One rule to plan around: unauthorised vessels may not lie alongside or near a moored ship. Only vessels the terminal has authorised in advance may, and then only outside the ship's operating period.

Not published anywhere we could find
  • The booklet gives no maximum stem size, either alongside by pipeline or by barge offshore.
  • There is no notice period specific to a bunker request - the 24-hour ETA rule is for ships booked to the flammables pier, not for bunkers.
  • The booklet names neither the barge operator nor the barges, and gives no barge capacities or pumping rates.
  • It does not say which anchorage offshore barge deliveries take place in; Areas 5 and 11 are described only for health-authority visits and for ships awaiting orders.
  • Beyond 'MGO' and 'MF', no specification or sulphur grade is given for what the terminal pumps alongside.

Ask the supplier to confirm these before you fix a stem on them.

VLSFO at nearby and alternative ports

PortGradeUSD / MTUpdated
VLSFO$7812026-09-0145d
VLSFO$7812026-08-3146d
VLSFO$7932026-09-0145d
VLSFO$8012026-09-0343d
VLSFO$8152026-09-0343d
VLSFO$8232026-09-0442d

Not an offer to sell — a firm price exists only once a supplier has quoted.

A lower headline price at another port is not automatically a saving. Deviation burns fuel and charter hire, and a bunker-only call costs port time.

True cost calculator →

Paranagua bunkering FAQ

What is the bunker price at Paranagua today?
The table above shows the latest indicative prices at Paranagua (BRPNG) for each grade we track, updated daily. These are market indications, not offers — the price you pay depends on quantity, delivery window, specification, your payment terms and your credit position with the supplier.
Is Paranagua a cheap bunkering port?
At the last update Paranagua was showing $940/MT for VLSFO. Whether that is genuinely cheap for your vessel depends on deviation: reaching a port that is $10/MT cheaper is not a saving if it costs a day of charter hire and the fuel burned getting there.
Does EU ETS apply at Paranagua?
Paranagua is outside the EU/EEA, so EU ETS does not apply to a call here in itself. It may still apply to the voyage legs if your vessel is heading to or from an EU port.