Port Louis bunker prices
MUPLU · MU · Major bunkering hub
Individual prices at Port Louis
| Grade | USD / MT | Updated |
|---|---|---|
| HSFO | $962 | 2026-10-097d |
| MGO | $1807 | 2026-10-097d |
| VLSFO | $1007 | 2026-10-097d |
Not an offer to sell — a firm price exists only once a supplier has quoted.
Indicative only. Typical stem time here is about 8 hours alongside.
Who supplies fuel at Port Louis
6 of these are on the port authority's register of licensed suppliers. The rest publish their own coverage of this port.
Their bunker desks, or send one request and let the replies come to you.
Taking fuel at Port Louis
Operational notes, from the port authority and the suppliers’ own published documents. Checked 2026-08-30.
Port Louis offers all three delivery routes, and the Mauritius Ports Authority's bunkering code sets out where each one works. Barges serve both the Inner Port quays and vessels at anchor in the Outer Port's northern and southern regions; no bunkering at all is permitted in the Entrance Channel or the English Channel. Shore pipelines reach only named berths, one operator at Quays 1 to 4 and the Oil Jetty, another at Quays A, D and E plus 1 to 4, a third at Quays A, D and E, so pipeline supply is berth-specific rather than general. Road bowsers cover vessels alongside that the pipelines do not reach.
Six barges are in service with cargo tanks between 741 and 21,316 cubic metres, which is the practical envelope; the Authority publishes no maximum stem. Manoeuvring requirements scale with barge size: twin screw from 250 to 500 GT, twin screw or single screw with bow thruster to 1,500 GT, twin screw with bow thrusters above that. The grades are VLSFO, HSFO and LSMGO.
Bunkering during cargo work is allowed, but only after a joint risk assessment by both masters and the cargo terminal operator, kept available for the Port Master. Operations stop above Beaufort force 6, two-metre swell or 27 knots of wind. Night supply is permitted subject to extra moorings and three-hourly reports to Harbour Radio between sunset and sunrise. Approvals run through the MACCS e-bunkering platform before anything starts, with final clearance from Harbour Radio on VHF; the code sets no minimum nomination notice, so lead time is a commercial question, not a regulatory one.
- No published maximum stem size
- No published minimum notice period for a bunker nomination
- No published pumping rates for the barges
- Berth and anchorage draught limits specifically for bunkering are not stated in the code
- No published tug or pilot requirement for a bunker barge shifting within the harbour
Ask the supplier to confirm these before you fix a stem on them.
Port Louis bunkering FAQ
- What is the bunker price at Port Louis today?
- The table above shows the latest indicative prices at Port Louis (MUPLU) for each grade we track, updated daily. These are market indications, not offers — the price you pay depends on quantity, delivery window, specification, your payment terms and your credit position with the supplier.
- Is Port Louis a cheap bunkering port?
- At the last update Port Louis was showing $1007/MT for VLSFO. Whether that is genuinely cheap for your vessel depends on deviation: reaching a port that is $10/MT cheaper is not a saving if it costs a day of charter hire and the fuel burned getting there.
- Does EU ETS apply at Port Louis?
- Port Louis is outside the EU/EEA, so EU ETS does not apply to a call here in itself. It may still apply to the voyage legs if your vessel is heading to or from an EU port.